{"id":943,"date":"2026-03-28T11:16:26","date_gmt":"2026-03-28T11:16:26","guid":{"rendered":"https:\/\/plotnearjewar.com\/blogs\/?p=943"},"modified":"2026-03-28T11:16:27","modified_gmt":"2026-03-28T11:16:27","slug":"faridabad-jewar-corridor-completion-2027-connectivity-project-update","status":"publish","type":"post","link":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/","title":{"rendered":"Faridabad Jewar Corridor to Be Completed by 2027: Connectivity Projects Gain Speed"},"content":{"rendered":"\n<p>The <strong>Faridabad Jewar Corridor<\/strong> is moving ahead at a fast pace, with authorities targeting full completion of major connectivity projects by April 2027. The infrastructure initiative aims to provide seamless road access between Faridabad and the upcoming Noida International Airport at Jewar, significantly reducing travel time and improving regional mobility across Delhi NCR.<\/p>\n\n\n\n<p>Officials monitoring the project have confirmed that construction work on key stretches, including elevated road sections and connecting corridors, has reached advanced stages. The project is expected to transform commuting patterns and strengthen Faridabad position as an important urban and investment hub.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Elevated Corridor Work Shows Strong Progress<\/strong><\/h2>\n\n\n\n<p>A major portion of the Faridabad Jewar Corridor involves an elevated road designed to enable faster and uninterrupted travel. According to project updates, nearly half of the elevated construction work has already been completed.<\/p>\n\n\n\n<p>Thousands of structural pillars are being installed as part of the project, with piling work progressing steadily. Construction agencies have also initiated girder casting, and the first installation phases are expected to begin soon.<\/p>\n\n\n\n<p>Once operational, the elevated stretch will allow vehicles especially heavy traffic to bypass city congestion, ensuring smoother travel between Faridabad and the airport region.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Direct Connectivity to Reduce Travel Time<\/strong><\/h2>\n\n\n\n<p>The upcoming corridor will dramatically improve access between Faridabad, Noida, and Jewar Airport. At present, commuters often rely on longer routes passing through Delhi, increasing both travel time and fuel costs.<\/p>\n\n\n\n<p>With the new road network in place, commuters are expected to experience faster connectivity and reduced traffic pressure on existing city roads. The project is also expected to benefit daily travelers who commute between industrial and residential zones within NCR.<\/p>\n\n\n\n<p>Infrastructure experts believe the corridor will create a direct high-speed route connecting major expressways and regional highways, enabling quicker airport access for passengers and logistics operators.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>DND Faridabad Section Nearing Completion<\/strong><\/h2>\n\n\n\n<p>Another important component of the connectivity plan is the DND\u2013Faridabad link. Authorities have accelerated construction on this stretch, aiming to complete it soon.<\/p>\n\n\n\n<p>Once operational, this section will provide direct expressway connectivity for commuters traveling from Delhi and Noida toward Faridabad and onward to Jewar. The improvement is expected to ease traffic congestion and streamline intercity movement.<\/p>\n\n\n\n<p>Residents have expressed optimism that the new corridor will significantly shorten daily travel durations and improve overall commuting convenience.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>FNG Road and Manjhawali Bridge to Strengthen Network<\/strong><\/h2>\n\n\n\n<p>The Faridabad-Noida-Ghaziabad (FNG) Road and the proposed Manjhawali bridge are considered crucial supporting projects for the Faridabad Jewar Corridor.<\/p>\n\n\n\n<p>Approval processes related to the FNG Road alignment are currently underway. Once finalized, construction will move forward rapidly. Meanwhile, road development linked to the Manjhawali bridge is also expected to begin soon, creating an alternative route connecting Greater Faridabad with Noida and Jewar.<\/p>\n\n\n\n<p>These additional links will help build an integrated transport network across NCR, reducing dependence on Delhi routes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Airport Connectivity Expected to Shift Investment Trends<\/strong><\/h2>\n\n\n\n<p>Urban planners believe improved connectivity to Jewar Airport may gradually shift economic activity toward new growth zones. As infrastructure improves, areas surrounding the corridor could witness increased real estate development, commercial investments, and industrial expansion.<\/p>\n\n\n\n<p>Experts suggest that Faridabad stands to benefit significantly due to its strategic location along the new route. Enhanced connectivity may attract businesses, logistics operations, and residential projects in the coming years.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2027 Completion Target Remains Key Milestone<\/strong><\/h3>\n\n\n\n<p>Authorities have set April 2027 as the deadline to complete the entire Faridabad Jewar Corridor connectivity system. Regular project reviews are being conducted to ensure construction timelines remain on track.<\/p>\n\n\n\n<p>With the upcoming airport expected to become a major aviation hub, the corridor\u2019s importance will continue to grow. Once completed, the project is likely to play a central role in reshaping transportation and economic development across the National Capital Region.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Faridabad Jewar Corridor is moving ahead at a fast pace, with authorities targeting full completion of major connectivity projects by April 2027. The infrastructure initiative aims to provide seamless road access between Faridabad and the upcoming Noida International Airport at Jewar, significantly reducing travel time and improving regional mobility across Delhi NCR. Officials monitoring [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1023,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[28,17],"tags":[24,26,39,30,31,33,25,36,27,35,38,34,29,40,37,32],"class_list":["post-943","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-jewar-real-estate-news","tag-jewar","tag-jewar-airport","tag-jewar-airport-latest-news-today-live","tag-jewar-airport-news-live","tag-jewar-airport-news-today","tag-jewar-airport-news-today-live","tag-jewar-news","tag-jewar-news-today","tag-noida-airport","tag-noida-airport-news","tag-noida-airport-news-today","tag-noida-international-airport-news","tag-noida-international-airport-news-today","tag-noida-news","tag-yeida-news","tag-32"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Faridabad Jewar Corridor: Faster Connectivity to Jewar Airport<\/title>\n<meta name=\"description\" content=\"Faridabad Jewar Corridor will reduce travel time to Jewar Airport and enhance regional mobility with modern expressway infrastructure.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Faridabad Jewar Corridor: Faster Connectivity to Jewar Airport\" \/>\n<meta property=\"og:description\" content=\"Faridabad Jewar Corridor will reduce travel time to Jewar Airport and enhance regional mobility with modern expressway infrastructure.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/\" \/>\n<meta property=\"og:site_name\" content=\"Real Estate News\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-28T11:16:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-28T11:16:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/plotnearjewar.com\/blogs\/wp-content\/uploads\/2026\/03\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"750\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Shiv Krishna\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Shiv Krishna\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/\"},\"author\":{\"name\":\"Shiv Krishna\",\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/#\\\/schema\\\/person\\\/cf65fb73d6ee2ef04be756c3660e6692\"},\"headline\":\"Faridabad Jewar Corridor to Be Completed by 2027: Connectivity Projects Gain Speed\",\"datePublished\":\"2026-03-28T11:16:26+00:00\",\"dateModified\":\"2026-03-28T11:16:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/\"},\"wordCount\":623,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png\",\"keywords\":[\"jewar\",\"jewar airport\",\"Jewar Airport latest news today live\",\"Jewar airport news live\",\"Jewar airport news today\",\"Jewar airport news today live\",\"jewar news\",\"Jewar News today\",\"noida airport\",\"noida airport news\",\"Noida airport news today\",\"Noida international airport news\",\"Noida international airport news today\",\"Noida News\",\"YEIDA News\",\"\u091c\u0947\u0935\u0930 \u090f\u092f\u0930\u092a\u094b\u0930\u094d\u091f\"],\"articleSection\":[\"News\",\"Real Estate\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/\",\"url\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/\",\"name\":\"Faridabad Jewar Corridor: Faster Connectivity to Jewar Airport\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png\",\"datePublished\":\"2026-03-28T11:16:26+00:00\",\"dateModified\":\"2026-03-28T11:16:27+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/#\\\/schema\\\/person\\\/cf65fb73d6ee2ef04be756c3660e6692\"},\"description\":\"Faridabad Jewar Corridor will reduce travel time to Jewar Airport and enhance regional mobility with modern expressway infrastructure.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/#primaryimage\",\"url\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png\",\"contentUrl\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png\",\"width\":1200,\"height\":750,\"caption\":\"Faridabad Jewar Corridor to Be Completed by 2027_ Connectivity Projects Gain Speed\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Faridabad Jewar Corridor to Be Completed by 2027: Connectivity Projects Gain Speed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/#website\",\"url\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/\",\"name\":\"Real Estate News\",\"description\":\"Daily Update News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/#\\\/schema\\\/person\\\/cf65fb73d6ee2ef04be756c3660e6692\",\"name\":\"Shiv Krishna\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/326e8363ee25ca44459b8b361d78fe44f8ae526597c1f770b76f682391b43329?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/326e8363ee25ca44459b8b361d78fe44f8ae526597c1f770b76f682391b43329?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/326e8363ee25ca44459b8b361d78fe44f8ae526597c1f770b76f682391b43329?s=96&d=mm&r=g\",\"caption\":\"Shiv Krishna\"},\"sameAs\":[\"https:\\\/\\\/plotnearjewar.com\\\/blogs\"],\"url\":\"https:\\\/\\\/plotnearjewar.com\\\/blogs\\\/author\\\/aksar\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Faridabad Jewar Corridor: Faster Connectivity to Jewar Airport","description":"Faridabad Jewar Corridor will reduce travel time to Jewar Airport and enhance regional mobility with modern expressway infrastructure.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/","og_locale":"en_US","og_type":"article","og_title":"Faridabad Jewar Corridor: Faster Connectivity to Jewar Airport","og_description":"Faridabad Jewar Corridor will reduce travel time to Jewar Airport and enhance regional mobility with modern expressway infrastructure.","og_url":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/","og_site_name":"Real Estate News","article_published_time":"2026-03-28T11:16:26+00:00","article_modified_time":"2026-03-28T11:16:27+00:00","og_image":[{"width":1200,"height":750,"url":"https:\/\/plotnearjewar.com\/blogs\/wp-content\/uploads\/2026\/03\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png","type":"image\/png"}],"author":"Shiv Krishna","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Shiv Krishna","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/#article","isPartOf":{"@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/"},"author":{"name":"Shiv Krishna","@id":"https:\/\/plotnearjewar.com\/blogs\/#\/schema\/person\/cf65fb73d6ee2ef04be756c3660e6692"},"headline":"Faridabad Jewar Corridor to Be Completed by 2027: Connectivity Projects Gain Speed","datePublished":"2026-03-28T11:16:26+00:00","dateModified":"2026-03-28T11:16:27+00:00","mainEntityOfPage":{"@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/"},"wordCount":623,"commentCount":0,"image":{"@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/#primaryimage"},"thumbnailUrl":"https:\/\/plotnearjewar.com\/blogs\/wp-content\/uploads\/2026\/03\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png","keywords":["jewar","jewar airport","Jewar Airport latest news today live","Jewar airport news live","Jewar airport news today","Jewar airport news today live","jewar news","Jewar News today","noida airport","noida airport news","Noida airport news today","Noida international airport news","Noida international airport news today","Noida News","YEIDA News","\u091c\u0947\u0935\u0930 \u090f\u092f\u0930\u092a\u094b\u0930\u094d\u091f"],"articleSection":["News","Real Estate"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/","url":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/","name":"Faridabad Jewar Corridor: Faster Connectivity to Jewar Airport","isPartOf":{"@id":"https:\/\/plotnearjewar.com\/blogs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/#primaryimage"},"image":{"@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/#primaryimage"},"thumbnailUrl":"https:\/\/plotnearjewar.com\/blogs\/wp-content\/uploads\/2026\/03\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png","datePublished":"2026-03-28T11:16:26+00:00","dateModified":"2026-03-28T11:16:27+00:00","author":{"@id":"https:\/\/plotnearjewar.com\/blogs\/#\/schema\/person\/cf65fb73d6ee2ef04be756c3660e6692"},"description":"Faridabad Jewar Corridor will reduce travel time to Jewar Airport and enhance regional mobility with modern expressway infrastructure.","breadcrumb":{"@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/#primaryimage","url":"https:\/\/plotnearjewar.com\/blogs\/wp-content\/uploads\/2026\/03\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png","contentUrl":"https:\/\/plotnearjewar.com\/blogs\/wp-content\/uploads\/2026\/03\/Faridabad-Jewar-Corridor-to-Be-Completed-by-2027_-Connectivity-Projects-Gain-Speed.png","width":1200,"height":750,"caption":"Faridabad Jewar Corridor to Be Completed by 2027_ Connectivity Projects Gain Speed"},{"@type":"BreadcrumbList","@id":"https:\/\/plotnearjewar.com\/blogs\/faridabad-jewar-corridor-completion-2027-connectivity-project-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/plotnearjewar.com\/blogs\/"},{"@type":"ListItem","position":2,"name":"Faridabad Jewar Corridor to Be Completed by 2027: Connectivity Projects Gain Speed"}]},{"@type":"WebSite","@id":"https:\/\/plotnearjewar.com\/blogs\/#website","url":"https:\/\/plotnearjewar.com\/blogs\/","name":"Real Estate News","description":"Daily Update News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/plotnearjewar.com\/blogs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/plotnearjewar.com\/blogs\/#\/schema\/person\/cf65fb73d6ee2ef04be756c3660e6692","name":"Shiv Krishna","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/326e8363ee25ca44459b8b361d78fe44f8ae526597c1f770b76f682391b43329?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/326e8363ee25ca44459b8b361d78fe44f8ae526597c1f770b76f682391b43329?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/326e8363ee25ca44459b8b361d78fe44f8ae526597c1f770b76f682391b43329?s=96&d=mm&r=g","caption":"Shiv Krishna"},"sameAs":["https:\/\/plotnearjewar.com\/blogs"],"url":"https:\/\/plotnearjewar.com\/blogs\/author\/aksar\/"}]}},"_links":{"self":[{"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/posts\/943","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/comments?post=943"}],"version-history":[{"count":1,"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/posts\/943\/revisions"}],"predecessor-version":[{"id":972,"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/posts\/943\/revisions\/972"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/media\/1023"}],"wp:attachment":[{"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/media?parent=943"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/categories?post=943"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plotnearjewar.com\/blogs\/wp-json\/wp\/v2\/tags?post=943"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}